wisemonkeys logo
FeedNotificationProfileManage Forms
FeedNotificationSearchSign in
wisemonkeys logo

Blogs

Mumbai Metro 3

profile
BURHANUDDIN FATEHI
Jul 25, 2022
0 Likes
0 Discussions
168 Reads

The Aqua Line 3 of the Mumbai Metro,[5] also known as Colaba-Bandra-Seepz Line, is a part of the metro system under construction in Mumbai, India.[6][7] When completed, the 33.5-km long line will be the first underground metro line in Mumbai and will be operated by MMRC.[8] The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central[9] with 26 underground and one at-grade station.[10] The track width is standard gauge. The cost of this corridor is estimated at ₹30,000 crore (US$3.8 billion). Line 3 is expected to reduce road congestion, besides reducing the load on the Western Line between Bandra and Churchgate.[11][12]

The project is being implemented by the Mumbai Metro Rail Corporation Limited (MMRCL). The line starts at Cuffe Parade, will run through Nariman Point, Churchgate, CSMT, Girgaon, Worli, Dadar, Mahim, Bandra-Kurla Complex, Santacruz (East) and past the domestic and international terminals of Mumbai Airport, through Andheri MIDC and terminates at SEEPZ.[11][13] The 33.5 km, Rs. 23,136 crore project involves five major entities - MMRCL (Mumbai Metro Rail Corporation Limited), Padeco, MMRDA, CREC (China),.[14] Major (65%) funding for the project was received through a soft loan of Rs. 13,235 crore from JICA (Japan International Cooperation Agency) with the rest provided by the exchequer through the Government of India and Government of Maharashtra.[15][14][16]

The section of the line between Bandra Kurla Complex and Dharavi stations includes a 170 metre long twin-tunnel passing under the Mithi river. One of the tunnels was completed in March 2020.[17] This will be the second under-river metro rail tunnel in India after the tunnel underneath the Hooghly river on Kolkata Metro Line 2.[18]

The construction of this metro route faced hurdles from environmentalists and activists lodging numerous PILs over cutting of trees in various region accompanied with a larger protest in Aarey over the carshed construction. PILs were either dismissed or didn't succeed as both the Supreme Court and the Maharashtra High Court cited the importance of the metro project.[19][20]

An extension of the line has also been proposed to extend the line by 2.5 km to Navy Nagar from Cuffe Parade. As per the initial plan, Cuffe Parade was planned to be the first station of the line; however, after extension, the first station will be Navy Nagar. There are 26 stations planned earlier, which will be 27 stations on the line after the extension. The extension on metro line 3 will cost an additional ₹2,301 crore.[21][22]


Comments ()


Sign in

Read Next

From Procrastinator to Performer: How to Beat the Last-Minute Rush

Blog banner

Trello ( management software)

Blog banner

Sweet and Sour Mango Pickle (Gol Keri)

Blog banner

What is metaverse?

Blog banner

Memory Management - operating system

Blog banner

Balance

Blog banner

Firewall in Computer Network

Blog banner

LIFEHACKER

Blog banner

What is Vishing?

Blog banner

PYTHON

Blog banner

Music

Blog banner

A-B-C of Networking: Part-3 (Topology [Ring, Tree, Mesh])

Blog banner

Decision Tree: A Diagram Model

Blog banner

Having passion in life

Blog banner

Modern Operating System - Suren Kotian

Blog banner

SQL Injection practice on DVWA

Blog banner

You'll get to know about Pankaj Negi

Blog banner

Cherish the Craft — Essential Tips to Maintain Your Patola Collection

Blog banner

UniProcessor Scheduling

Blog banner

Quality check in IT services

Blog banner

Direct Memory Access

Blog banner

10 Reasons Why Guy BestFriends are the Must in Every Girl's Life

Blog banner

What is semaphore in operating system?

Blog banner

Different types of e-commerce platforms or advantages and disadvantages

Blog banner

MY FIRST BLOG?

Blog banner

Cyber Bullying - Neeta Vonkamuti

Blog banner

Deadlock and starvation in operating system

Blog banner

Cloud Computing

Blog banner

Metasploit

Blog banner

The Five Steps of Data Science

Blog banner

Risk management in IT

Blog banner

Data Acquisition in Cyber Forensics

Blog banner

Computer Forensics and its Impact in Business Environment

Blog banner

Interrupts

Blog banner

10 Reasons why Monica and Chandler are the best couple ever.!!!

Blog banner

MOBILE DEVICE FORENSIC

Blog banner

Mumbai

Blog banner

Teamwork

Blog banner

Types of Hackers

Blog banner

Vulnerability Assessment

Blog banner

Love is in air.....

Blog banner

Facebook Shut Down an AI Program!!! Facebook AI bots became Terminators???

Blog banner