wisemonkeys logo
FeedNotificationProfileManage Forms
FeedNotificationSearchSign in
wisemonkeys logo

Blogs

Mumbai Metro 3

profile
BURHANUDDIN FATEHI
Jul 25, 2022
0 Likes
0 Discussions
168 Reads

The Aqua Line 3 of the Mumbai Metro,[5] also known as Colaba-Bandra-Seepz Line, is a part of the metro system under construction in Mumbai, India.[6][7] When completed, the 33.5-km long line will be the first underground metro line in Mumbai and will be operated by MMRC.[8] The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central[9] with 26 underground and one at-grade station.[10] The track width is standard gauge. The cost of this corridor is estimated at ₹30,000 crore (US$3.8 billion). Line 3 is expected to reduce road congestion, besides reducing the load on the Western Line between Bandra and Churchgate.[11][12]

The project is being implemented by the Mumbai Metro Rail Corporation Limited (MMRCL). The line starts at Cuffe Parade, will run through Nariman Point, Churchgate, CSMT, Girgaon, Worli, Dadar, Mahim, Bandra-Kurla Complex, Santacruz (East) and past the domestic and international terminals of Mumbai Airport, through Andheri MIDC and terminates at SEEPZ.[11][13] The 33.5 km, Rs. 23,136 crore project involves five major entities - MMRCL (Mumbai Metro Rail Corporation Limited), Padeco, MMRDA, CREC (China),.[14] Major (65%) funding for the project was received through a soft loan of Rs. 13,235 crore from JICA (Japan International Cooperation Agency) with the rest provided by the exchequer through the Government of India and Government of Maharashtra.[15][14][16]

The section of the line between Bandra Kurla Complex and Dharavi stations includes a 170 metre long twin-tunnel passing under the Mithi river. One of the tunnels was completed in March 2020.[17] This will be the second under-river metro rail tunnel in India after the tunnel underneath the Hooghly river on Kolkata Metro Line 2.[18]

The construction of this metro route faced hurdles from environmentalists and activists lodging numerous PILs over cutting of trees in various region accompanied with a larger protest in Aarey over the carshed construction. PILs were either dismissed or didn't succeed as both the Supreme Court and the Maharashtra High Court cited the importance of the metro project.[19][20]

An extension of the line has also been proposed to extend the line by 2.5 km to Navy Nagar from Cuffe Parade. As per the initial plan, Cuffe Parade was planned to be the first station of the line; however, after extension, the first station will be Navy Nagar. There are 26 stations planned earlier, which will be 27 stations on the line after the extension. The extension on metro line 3 will cost an additional ₹2,301 crore.[21][22]


Comments ()


Sign in

Read Next

Image Steganography: Hiding Secrets in Plain Sight

Blog banner

SQL Injection

Blog banner

Software Piracy & Online Data Protection in Digital World

Blog banner

Data Visualization in Decision-Making

Blog banner

Deadlock and starvation

Blog banner

Sagar Parikrama

Blog banner

Why Consistency in Eating Habits Matters and How Meal Maharaj Makes It Easy

Blog banner

Deadlock and Starvation in an Operating System

Blog banner

Security issues

Blog banner

Biometric Authentication Vulnerabilities

Blog banner

Instagram

Blog banner

Bit Coins

Blog banner

GIS in Disaster Management

Blog banner

MULTITHREADING:ENHANCEING PERFORMANCE AND EFFICIENCY IN COMPUTING

Blog banner

Have You Explored India Yet?

Blog banner

Virus

Blog banner

File management

Blog banner

Design Considerations for Disk Cache Management

Blog banner

Utilizing Data-Hiding and Retrieval Techniques in Cyber Forensics

Blog banner

Child labour

Blog banner

Deadlock

Blog banner

Multiprocessor and Multicore Organization

Blog banner

DATA VAULT

Blog banner

Cache Memory(142)

Blog banner

Deadlocks in Operating System

Blog banner

Virtual memory

Blog banner

Buffering

Blog banner

Sleep Matters: The Science Behind Toddler Naps

Blog banner

Types of Threads

Blog banner

E-security systems | CCTV

Blog banner

Lemon and Chilli Pickle (Limbu Mirchi Achar)

Blog banner

Microsoft powerpoint presentation

Blog banner

SECURITY RISKS OF REMOTE WORKING

Blog banner

Rapido

Blog banner

RAID

Blog banner

INDIAN CHEAPEST COSMETICS BRAND

Blog banner

Subnet Masking

Blog banner

Types of Threads

Blog banner

RAID_142

Blog banner

Method of Evaluating Information Security Level in an Organization

Blog banner

Memory

Blog banner

Kernel in Operating System

Blog banner