PERT Overview

profile
Zayed Lalljee
Sep 14, 2022
0 Likes
0 Discussions
187 Reads

 

PERT event: a point that marks the start or completion of one or more activities. It consumes no time and uses no resources. When it marks the completion of one or more activities, it is not "reached" (does not occur) until all of the activities leading to that event have been completed.

 

predecessor event: an event that immediately precedes some other event without any other events intervening. An event can have multiple predecessor events and can be the predecessor of multiple events.

 

successor event: an event that immediately follows some other event without any other intervening events. An event can have multiple successor events and can be the successor of multiple events.

 

Besides events, PERT also knows activities and sub-activities:

 

PERT activity: the actual performance of a task which consumes time and requires resources (such as labor, materials, space, machinery). It can be understood as representing the time, effort, and resources required to move from one event to another. A PERT activity cannot be performed until the predecessor event has occurred.

 

PERT sub-activity: a PERT activity can be further decomposed into a set of sub-activities. For example, activity A1 can be decomposed into A1.1, A1.2 and A1.3. Sub-activities have all the properties of activities; in particular, a sub-activity has predecessor or successor events just like an activity. A sub-activity can be decomposed again into finer-grained sub-activities.

 

PERT has defined four types of time required to accomplish an activity:

 

optimistic time: the minimum possible time required to accomplish an activity (o) or a path (O), assuming everything proceeds better than is normally expected

 

pessimistic time: the maximum possible time required to accomplish an activity (p) or a path (P), assuming everything goes wrong (but excluding major catastrophes).

 

most likely time: the best estimate of the time required to accomplish an activity (m) or a path (M), assuming everything proceeds as normal.

 

expected time: the best estimate of the time required to accomplish an activity (te) or a path (TE), accounting for the fact that things don't always proceed as normal (the implication being that the expected time is the average time the task would require if the task were repeated on a number of occasions over an extended period of time).


Comments ()


Sign in

Read Next

Hubspot

Blog banner

Technical Challenges and Directions for Digital Forensics

Blog banner

Kafka - A Framework

Blog banner

Basic Security For SOAP Services

Blog banner

Service Catalogue Management

Blog banner

Data Mining

Blog banner

Data Visualization in Decision-Making

Blog banner

How to invest in Indian Stock Market ? ~ Tutorial 1

Blog banner

Multiprocessor and scheduling

Blog banner

Cache memory

Blog banner

Traditional UNIX Scheduling

Blog banner

Data Science in Mental Health Prediction

Blog banner

Data Visualization – Importance and tools (Tableau, Power BI)

Blog banner

VIRTUAL MACHINES

Blog banner

DEVELOPMENTS LEADING TO MODERN OPERATING SYSTEMS

Blog banner

Outlook mail

Blog banner

Mobile Security

Blog banner

12 Principles of Animation

Blog banner

The khan mehtab transforming the modular switches company

Blog banner

File Management system

Blog banner

Bitcoin sent using radio waves! No internet!

Blog banner

Digital Forensics Challenges and Tools

Blog banner

Virtual memory in Operating System

Blog banner

DATA VAULT

Blog banner

File management

Blog banner

Blockchain in IoT Applications

Blog banner

Rain bow

Blog banner

Synchronization

Blog banner

Modern Operating System

Blog banner

Threads Concurrency: Mutual Exclusion and Synchronization

Blog banner

Broken Authentication Attacks

Blog banner

Threading

Blog banner

Electronic Evidence in Cyber Forensics

Blog banner

Different types of scam frauds

Blog banner

New Horizon Europe project ‘EvoLand’ sets off to develop new prototype services.

Blog banner

Modern Operating System

Blog banner

Guidelines for a Low sodium Diet.

Blog banner

Zoho

Blog banner

Product Discount Calculator

Blog banner

Types of Hackers

Blog banner

File management In Operating System

Blog banner

E-security systems | CCTV

Blog banner